Easy way of changing scope?

If you have a carbon footprint (and Epd) which is calculated in the scope A1-A3 +C/D is there a simple way of recalculating based on A1-A3 only?

Hi David,

Thanks for your question.

There are a few different ways to do this depending on how you like to work in the software.

Import form:
If you’re using the excel import form, you could remove the stages you don’t which to report from the excel file and then import the rest of the data to a new design.

Copy design and edit:
You could create a copy of the existing design, amend the scope in the design creation window (shown below), and then delete the data from the stages that are outside the scope.

Create blank design and copy data from specific queries only (old user interface):
In the old user interface, create a blank design in the same project as the existing. Then go to a specific query (section) of the blank design that you want to copy the data from, e.g., Materials (A1-A3), or Manufacturing (A3). Use the “Copy data from another design” feature to copy only that specific query, and repeat for all queries you want the data for.

Step 1:

Step 2:

If this last option is useful and you would benefit from having it in the new user interface, please feel welcome to upvote the idea in our Ideas Board, or add your own suggestions, here: Ideas Board

I hope this helps,
Graham