What are the main barriers to meeting the 70% recovery target for construction and demolition waste in the Nordics?

Construction and demolition waste (CDW) constitutes over a third of the EU’s total waste, presenting a significant environmental challenge. Despite efforts, the Nordics face obstacles in achieving the 70% recovery target. A recent analysis identifies economic and legislative barriers as the primary impediments — technical solutions are already available.

Key solutions to overcome these challenges include:

  • Improved on-site sorting and pre-demolition audits.
  • Economic and regulatory incentives to prioritize reuse and recycling.
  • Designing buildings for easier future disassembly and material recovery.

Collaboration at both the Nordic and EU levels is crucial for progress.
Read the full report for deeper insights: https://pub.norden.org/temanord2023-544/index.html