29 EPDs in two months

I tend to avoid posting case studies randomly, however, I just realized that our Marketing team has published this one:

29 EPDs in two months - Hydrotec

Sole reason I’m posting it is because back when I was still working with One Click LCA’s customers, it was a very common question “How many EPDs can we do realistically?” and even though the EPD Gen is quite automated and can do a ton of EPDs on annual basis, I never thought that 29 is a number that can be reached.

Oh well, I was wrong! What’s always interesting is reading through the key takeaways when doing a project and that’s what I found to be intriguing

“Making EPDs forces us to continually update the data on our products and encourages us to look at each individual part of their life cycles.”

Quite often we get consumed by the extremely fast pace at which changes in our niche are happening and we try to produce documentation just to satisfy regulatory requirements and we miss the forest; the nature of EPDs allow us to optimize the entire manufacturing process of our products and in the process of doing so figure out all the little hotspots that come up along the way!

2 Likes

29 EPDs in 2 months is certainly impressive, good job Hydrotec!