## [RICS, GLA and Part Z](https://community.oneclicklca.com/t/rics-gla-and-part-z/15)

<div class="topic-metadata">

**Author:** [@Steven](https://community.oneclicklca.com/u/Steven)\
**Replies:** 0

</div>

Discuss or ask questions related to RICS, GLA or Part Z. RICS & GLA Helpcenter Section External: RICS Whole Life Carbon Assessment 2nd Edition External: London Plan (GLA) WLCA Guidance External: Part Z Website

---

## [PV energy input into LCA](https://community.oneclicklca.com/t/pv-energy-input-into-lca/3080)

<div class="topic-metadata">

**Author:** [@Josef\_Clough](https://community.oneclicklca.com/u/Josef_Clough)\
**Replies:** 1\
**Last updated:** [August 3, 2026, 10:27am UTC](https://community.oneclicklca.com/t/pv-energy-input-into-lca/3080 "2026-08-03T10:27:55Z")

</div>

In the energy consumption tab on OneClick what is the figure I put if there is PV? I have a building that will use 421116 kWh. It will also generate 284800 kWh of electricity from PV. Therefore is the figure for energy c…

---

## [One Click LCA & RICS PS V2: Discrepancy with C1-C4 Sequestered Carbon](https://community.oneclicklca.com/t/one-click-lca-rics-ps-v2-discrepancy-with-c1-c4-sequestered-carbon/2332)

<div class="topic-metadata">

**Author:** [@Lewis\_Ingham](https://community.oneclicklca.com/u/Lewis_Ingham)\
**Replies:** 3\
**Last updated:** [August 5, 2025, 1:58pm UTC](https://community.oneclicklca.com/t/one-click-lca-rics-ps-v2-discrepancy-with-c1-c4-sequestered-carbon/2332 "2025-08-05T13:58:03Z")

</div>

Hi all, I’m having trouble aligning the One Click LCA output (with RICS PS V2 settings) with RICS V2 reporting requirements, specifically regarding how sequestered carbon is handled in the C1-C4 modules. Issue: When u…

---

## [RICS/GLA Editable End of Life Scenarios](https://community.oneclicklca.com/t/rics-gla-editable-end-of-life-scenarios/2305)

<div class="topic-metadata">

**Author:** [@Lewis\_Ingham](https://community.oneclicklca.com/u/Lewis_Ingham)\
**Replies:** 3\
**Last updated:** [July 21, 2025, 2:27pm UTC](https://community.oneclicklca.com/t/rics-gla-editable-end-of-life-scenarios/2305 "2025-07-21T14:27:43Z")

</div>

End of Life Scenarios While using One Click (on a Business License) for the ‘Whole life carbon assessment, GLA / RICS / Green Mark including EN15804 +A2 data’ tool, with the parameters set as per the One Click guidance …

---

## [RICS v2 resuts tab](https://community.oneclicklca.com/t/rics-v2-resuts-tab/1858)

<div class="topic-metadata">

**Author:** [@hiranmoy.phkn](https://community.oneclicklca.com/u/hiranmoy.phkn)\
**Replies:** 5\
**Last updated:** [July 15, 2025, 2:39pm UTC](https://community.oneclicklca.com/t/rics-v2-resuts-tab/1858 "2025-07-15T14:39:41Z")

</div>

Hi all, I have a query working on RICS v2 edition. The project is in RIBA 3 hence 6% contingency is included in ‘Top up factor’ tab with 2611 m2 in ‘building area’ However in the results section, total GWP per m2 (k…

---

## [RICS 2nd edition: Operational electricity conversion factor query](https://community.oneclicklca.com/t/rics-2nd-edition-operational-electricity-conversion-factor-query/2256)

<div class="topic-metadata">

**Author:** [@hiranmoy.phkn](https://community.oneclicklca.com/u/hiranmoy.phkn)\
**Replies:** 7\
**Last updated:** [June 27, 2025, 7:59am UTC](https://community.oneclicklca.com/t/rics-2nd-edition-operational-electricity-conversion-factor-query/2256 "2025-06-27T07:59:16Z")

</div>

Hi I am working on for an assessment in RICS 2nd edition tool. While entering input for electricity consumption, the available entry is ‘Electricity, UK 2023, based on energy supplementary table of Whole life carbon ass…

---

## [Module A5.2 Benchmark Breakdowns](https://community.oneclicklca.com/t/module-a5-2-benchmark-breakdowns/2229)

<div class="topic-metadata">

**Author:** [@tomroxburgh](https://community.oneclicklca.com/u/tomroxburgh)\
**Replies:** 1\
**Last updated:** [June 10, 2025, 10:57am UTC](https://community.oneclicklca.com/t/module-a5-2-benchmark-breakdowns/2229 "2025-06-10T10:57:01Z")

</div>

Good Morning, Are there any breakdowns of Module A5.2 specifically targeting energy/utility consumption per site?. There are lots of now out dated information from the 2000s so i am looking for a case study or if there…

---

## [RICS 2nd edition excel upload](https://community.oneclicklca.com/t/rics-2nd-edition-excel-upload/1794)

<div class="topic-metadata">

**Author:** [@Grigory](https://community.oneclicklca.com/u/Grigory)\
**Replies:** 5\
**Last updated:** [November 14, 2024, 9:58am UTC](https://community.oneclicklca.com/t/rics-2nd-edition-excel-upload/1794 "2024-11-14T09:58:37Z")

</div>

Hi, I had some issues uploading the Excel template into OneClick RICs v2 tool (the template available here Upload template Below are some of my issues: RICS v2 seems not to have all EPDs as RICS v1. For example buildi…

---

## [New RICS - domestic building envelope calculated for 120 Years (RSP)](https://community.oneclicklca.com/t/new-rics-domestic-building-envelope-calculated-for-120-years-rsp/806)

<div class="topic-metadata">

**Author:** [@jana.boult](https://community.oneclicklca.com/u/jana.boult)\
**Replies:** 1\
**Last updated:** [March 7, 2024, 12:26pm UTC](https://community.oneclicklca.com/t/new-rics-domestic-building-envelope-calculated-for-120-years-rsp/806 "2024-03-07T12:26:26Z")

</div>

Hi, can you please advise how is this done in the OneClick software, if only the envelope should be calculated for 120 years and the rest of the building for 60?

---

## [Low Carbon at Low Cost — Part Z](https://community.oneclicklca.com/t/low-carbon-at-low-cost-part-z/405)

<div class="topic-metadata">

**Author:** [@leonardo.poli](https://community.oneclicklca.com/u/leonardo.poli)\
**Replies:** 0\
**Last updated:** [January 26, 2024, 10:31am UTC](https://community.oneclicklca.com/t/low-carbon-at-low-cost-part-z/405 "2024-01-26T10:31:19Z")

</div>

Is low-carbon design more expensive? The answer is NO - but you need to start addressing sustainability as early as possible. This is why One Click LCA is designed to help you minimise emissions and future-proof your…